California
- Details
2.5" and 6" Hottaps on Hot and Cold Water Pipeline at Illumina Facility San Diego
Job Date: September 22, 2017
JOB LOCATION: San Diego, CA.
PROJECT: Illumina Facility
Job Specifics:
1 – Mobilization – Prep / Travel to job site
Item I – 2.5” Hot Tap on 3” Sch. 40 Carbon Steel Hot Water Line – under 150 psi
2 –2.5” Hot Tap on 3” Carbon Steel Hot Water line- under 150 psi /under 150 degrees
****Through Customer Supplied & Installed Fitting And Full Port Valve***
Item II – 6” Hot Tap on 12” Sch. 40 Carbon Steel Chilled Water Line
2 – 6” Hot Tap on 12” Carbon Steel Chilled Water line - under 150 psi
****Through Customer Supplied & Installed Fitting And Full Port Valve***
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .
- Details
- Details
Dual 30" and 54" Pipe Linestop Services + Bypass
Job Date: May 4, 2015
Location: Long Beach, CA
Job Specifics: Linestop® 48” SCCP Steel pipe / Actually 54” SCCP/ 56.9” Concrete
2 – 54” Linestop fittings 2 – Removal of pipe coating & Welding of assembly
2 – Insertion of 48” linestops on water for up to 7 days
2 – 4” Taps for blow down (If Needed)
2 – Removal of Linestop and install completion plug and cap 4” Bypass outlets off of Linestop machinery for your bypass installation.
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .
Dual 30" and 54" Pipe Linestop Services + Bypass
- Details
Torrance Medical Center many 2.5” Linestop on Domestic Copper Cold waterline under 150psi and ¾” Hottaps on 2.5” Copper waterline
Job Date: September 11, 2017
JOB LOCATION: Torrance, CA.
PROJECT: Torrance Medical Center
Job Specifics:
1 – Mobilization – Prep / Travel to job site
Item I – 2.5”Linestop on Domestic Copper Cold waterline under 150psi
22 – 2.5” Linestop fittings for Domestic Copper Cold Waterline under 150 psi
22 - Installation of fittings 22 – Pressure test and hottap pipe for Linestop installation
22 – 2.5” Linestops held for up to 4 hours while you perform pipeline modifications
22 – Remove Linestop and installation of completion plug with cap
Item II – ¾” Hottaps on 2.5” Copper waterline under 150 psi
9 - .75” Hottaps on 2.5” Copper waterline under 150 psi
9 - 2.5” x .75” Tapping Saddle Fittings – Smith/Blair 317 Epoxy Coated w/SS straps
9 - .75” Full Port Valves - Anvil 171N or equal
9 - Pressure test Fittings after Installation and Hottap Pipe.
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .
- Details
Dual 48" Wall Tapping Services
Job Date: July 18, 2013
Location: City of Van Nuys Sewage Process Plant
Job Specifics: Dual 48" Walltaps with 13" slugs in a very tight location as pictured below.
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .