Mercy Hospital 8” Linestop on Sch. 40 Carbon Steel Steam Condensation line Under 100 psi 

Mercy Hospital 8” Linestop on Sch. 40 Carbon Steel Steam Condensation line Under 100 psi

Job Status: Successful and Completed
Job Date: June 06, 2017
JOB LOCATION: San Diego, Ca.
PROJECT: Mercy Hospital
Job Specifics:
Item I – 8” Linestop on Sch. 40 Carbon Steel Steam Condensation line Under 100 psi
1 – Mobilization Prep / Travel to site to perform Linestops
1 - Provide 8” Linestop fitting for Sch. 40 Carbon Steel Water Pipe - under 140 degrees
1 – Install / Weld-on Fittings, Pressure test Fittings and Hottap pipeline (See Welding Notes)
1 – 8” Linestop Installed and held for up to 6 hours ea. (While pipeline modifications are performed by others)
1 – Removal of Linestops and install completion plug with Blind Flange. Blow-off assemblies as required

Item II – 8” x 4” Hottap on Sch. 40 Carbon Steel Steam Condensation line Under 100 psi
1 – Mobilization Prep / Travel to site to perform Hottap (Same Mobilization as Linestop)
1 - Provide 8” x 4” Flanged fitting for Sch. 40 Carbon Steel Water Pipe
1 – Install / Weld-on Fittings, Pressure test Fittings (See Welding Notes)
1 - 4” Hottap on Carbon Steel Pipeline NOTE: Excludes Valve, ‘Others’ to Supply Flanged Valve per Specifications

OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .