1-800-221-3332
Contact us Today!

 Anchorage, AK • Delaware, DE • Oklahoma City, OK • Nashville, TN • New Orleans, LA • Houston, TX

2- 30” Linestops on PCCP Water Main with By Pass in Corsicana, Texas

IFT Featured Texas Job: 2- 30” Linestops on PCCP Water Main with By Pass - 5.0 out of 5 based on 6 reviews

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active

2- 30” Linestops on PCCP Water Main with By Pass in Corsicana, Texas

2- 30” Linestops on PCCP Water Main with By Pass in Corsicana, Texas

Job Status: Job completed. 
Job Date: May 30, 2018
Location: Corsicana, Texas 
Job Specifics: 2- Linestop 30” PCCP Water Main with By Pass 

Line Pressure: 100 PSI working pressure or less Line Contents:
Water Main Pipe Material: PCCP B-303
Pipe Specifications: Pipe OD = 35.00” Max – Cylinder OD = 31.875”

ltem l Linestop 30” PCCP Water Main with By Pass
1 – Set Up and Mobilization to site
2 – 30” Linestop Fittings for PCCP Water Pipeline (100 PSI or less) (JCM 445 Primer Coated Bodies / Epoxy Coated Water Way – Alloy bolts)
2 – 24” Hot Taps to allow for linestop entry
2 - 2” Saddles with Taps for blow off and equalizing to remove linestops (JCM 425 Primer Coated Bodies / Epoxy Coated Water Way – Alloy bolts)
2 – Insertion of 30” linestop for 7 Days or Less 2– Removal of Linestop, install Completion Plugs and Blind Flanges.

OR call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .

 

 

Go to top