Dual 4” Carbon Steel Pipe Linestops in Nashville, TN.

Dual 4” Carbon Steel Pipe Linestops in Nashville, TN.

Job Status: Successful and Completed
Job Date: July 16, 2018
JOB LOCATION: Nashville, TN.
PROJECT: Vanderbilt

1 – Mobilization – Prep / Travel to Job Site

ltem l Linestop 4” Carbon Steel Pipe
2 – 4” Linestop fitting for Carbon Steel Chilled Water (100 PSI or Less) (Fitting provided by IFT and weld on by Contractor)
2 – Installation of temporary valve with air test.
2 – Hot Taps to allow for linestop entry
2 – Insertion of linestop for 1 day
2 – 3/4” Tap on contractor supplied and installed materials for blow down and equalizing pressure to remove linestop. (If Needed)
2– Removal of Linestop, install completion plug and cap

OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .