3" Linestops for Los Angeles County Sanitation on Steel Pipe in Carson

3” Linestops using the Qual Tech Machine for Los Angeles County Sanitation on Steel in Carson, California

Job Status: Successful and Completed
Job Date: June 13, 2018
JOB LOCATION:  Carson, CA.
PROJECT: 3" Linestops for Carson, California

1 – Mobilization – Prep / Travel to Job Site

Item #I 3” Linestop on 3” Sch. 40 Carbon Steel Cooling Water Pipe under 100 degrees under 100psi
2 – 3” Linestops on Carbon Steel Cooling Water Pipeline under 100 PSI
2 - Installation / Welding of Fittings (See Welding Notes)
2 - Pressure Test and Hot Tap / Installation of Linestops
2 - 3” Linestops held for up to 4 hours while you perform pipeline modifications.
2 - Removal of Linestop and installation of Completion Plugs with Caps. Blow off assemblies as required

OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .