IFT Featured California Job: 3" Linestops for Los Angeles County Sanitation on Steel Pipe in Carson
- Details
IFT Featured California Job: 3" Linestops for Los Angeles County Sanitation on Steel Pipe in Carson - 5.0 out of
5
based on
4 reviews
3" Linestops for Los Angeles County Sanitation on Steel Pipe in Carson
Job Status: Successful and Completed
Job Date: June 13, 2018
JOB LOCATION: Carson, CA.
PROJECT: 3" Linestops for Carson, California
1 – Mobilization – Prep / Travel to Job Site
Item #I 3” Linestop on 3” Sch. 40 Carbon Steel Cooling Water Pipe under 100 degrees under 100psi
2 – 3” Linestops on Carbon Steel Cooling Water Pipeline under 100 PSI
2 - Installation / Welding of Fittings (See Welding Notes)
2 - Pressure Test and Hot Tap / Installation of Linestops
2 - 3” Linestops held for up to 4 hours while you perform pipeline modifications.
2 - Removal of Linestop and installation of Completion Plugs with Caps. Blow off assemblies as required
Job Date: June 13, 2018
JOB LOCATION: Carson, CA.
PROJECT: 3" Linestops for Carson, California
1 – Mobilization – Prep / Travel to Job Site
Item #I 3” Linestop on 3” Sch. 40 Carbon Steel Cooling Water Pipe under 100 degrees under 100psi
2 – 3” Linestops on Carbon Steel Cooling Water Pipeline under 100 PSI
2 - Installation / Welding of Fittings (See Welding Notes)
2 - Pressure Test and Hot Tap / Installation of Linestops
2 - 3” Linestops held for up to 4 hours while you perform pipeline modifications.
2 - Removal of Linestop and installation of Completion Plugs with Caps. Blow off assemblies as required
OR Call
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .