30" Linestops on PCCP Water Main with 16" Bypass

30” Linestops on PCCP Water Main with 16” By-Pass in San Antonio, TX

Job Status: Job completed. 
Job Date: October 12, 2018
Location: San Antonio, Texas 
Job Specifics: 30" Linestops on PCCP Water Main with 16" Bypass

Line Pressure: 100 PSI working pressure or less
Line Contents: Water Main
Pipe Material: PCCP L-301
Pipe Specifications: Pipe OD = 36.00” Max – Cylinder OD = 33.75”

ltem l Linestop 30” PCCP Water Main – 16 By Pass
1 – Set Up and Mobilization to site
2 – 30” Linestop Fittings for PCCP Water Pipeline (100 PSI or less) (JCM 445 Primer Coated Bodies / Epoxy Coated Water Way – Alloy bolts) 
2 – 24” Hot Taps to allow for linestop entry
2 - 2” Saddles with Taps for blow off and equalizing to remove linestops (JCM 425 Primer Coated Bodies / Epoxy Coated Water Way – Alloy bolts)
2 – Insertion of 30” linestop for 14 Days or Less
2– Removal of Linestop, install Completion Plugs and Blind Flanges. (24” ANSI 150# Flanged out off linestop equipment for your by pass)