IFT Featured California Job: 5” Pipe Freeze Plug and 6" Linestop for St. Joseph Hospital
- Details
IFT Featured California Job: 5” Pipe Freeze Plug and 6" Linestop for St. Joseph Hospital - 5.0 out of
5
based on
5 reviews
5” Pipe Freeze Plug and 6" Linestop for St. Joseph Hospital
Job Status: Successful and Completed
Job Date: October 19, 2015
JOB LOCATION: Santa Ana, CA. PROJECT: FreezePlugs / Linestop
Job Specifics:
Item 1.
1 - 5” Indoor Pipe Freeze Plug on 5” Carbon Steel Water Pipe
1 - Travel to job site
1 – 5” FreezePlug on Carbon Steel Water Pipe under 150 PSI / 100 degrees or less
1 - Hold FreezePlug for up to 4 hours each. Item 2. 6” Linestop on 6” Carbon Steel Domestic Water Pipe
1 – 6” Linestop fitting for Domestic Carbon Steel Water Pipe under 150 PSI / 100 degrees
1 - Weld on Tapping Saddle
1 - Pressure test fitting and Hot Tap pipe.
1 - 6” Linestop held for up to 4 hours while you perform pipeline modifications
1 - Removal of Linestop and installation of completion plug with cap. Blow-off assembly as required.
Job Date: October 19, 2015
JOB LOCATION: Santa Ana, CA. PROJECT: FreezePlugs / Linestop
Job Specifics:
Item 1.
1 - 5” Indoor Pipe Freeze Plug on 5” Carbon Steel Water Pipe
1 - Travel to job site
1 – 5” FreezePlug on Carbon Steel Water Pipe under 150 PSI / 100 degrees or less
1 - Hold FreezePlug for up to 4 hours each. Item 2. 6” Linestop on 6” Carbon Steel Domestic Water Pipe
1 – 6” Linestop fitting for Domestic Carbon Steel Water Pipe under 150 PSI / 100 degrees
1 - Weld on Tapping Saddle
1 - Pressure test fitting and Hot Tap pipe.
1 - 6” Linestop held for up to 4 hours while you perform pipeline modifications
1 - Removal of Linestop and installation of completion plug with cap. Blow-off assembly as required.
OR Call
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .