3" Hot Tap on 6” Carbon Steel Cold Water in Savannah, Georgia
Job Date: October 11, 2018
JOB LOCATION: Savannah, GA
PROJECT: 3" Hot Tap on 6” Carbon Steel Cold Water
1 – Travel to site
1 – 3” Hot Tap on 6” Carbon Steel Cold Water (100 PSI or Less) Through Contractor furnish and preinstalled materials.
1 – Air Testing of tapping equipment (ANSI 150# Flange or IPS Connection)
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .
- Details
12" Insert Valve Installation on Transite Pipeline in Santa Ana, California
Job Date: November 18, 2015
JOB LOCATION: Santa Ana, CA.
PROJECT: 12" Insert Valve Installation
1- 12” Insert Valve Outdoor on Transite Pipe Water Main – Left Hand open
1 - Mobilization / Travel
1 - 12" Team Insert Valve for Transite Pipe Water Main 150 PSI or less
1 - Installation of valve with pressure test
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .
- Details
Double 42" Linestops on 42" PCCP Water Pipeline in Avon Lake, Ohio
Job Date: October 15, 2018
JOB LOCATION: Avon Lake, OH.
PROJECT: Double 42" Linestop on PCCP Water Main
IFT is pleased to submit the following quotation.
For Linestop® Services
Line Pressure: 100 or less
Line Contents: Water Main
Flow Rate: Less Than 2 Feet per second (FPS) Flow Rate
Pipe Material: PCCP L-301 (Pipe OD = 50.5 Cylinder OD = 47.25)
Pipe Specifications: 42” – Horizontal Linestops
Maximum Flow Rate allowed: Flow rates of 1 ft/sec for Single Linestop® or 2 ft/sec for Double Linestop® shall not be exceeded.
ltem l Linestop® 42” PCCP Water Main – 30” By Pass
1 – Set Up and Mobilization to site
2 – 42” Linestop Fittings for PCCP L-301 Water Pipeline (100 PSI or less)
(JCM 445 Primer Coated Bodies / Epoxy Coated Water Way – Alloy bolts)
Installation of saddles with test
2 – 36” Hot Taps to allow for linestop entry
2 – Insertion of 48” linestop for 3 Days or Less
2 – 30” Epoxy Coated Blind Flanges with (2) lifting eyes
2– Removal of Linestop, install Completion Plugs and Blind Flanges.
(30” ANSI 150# Flanged outlet off linestop equipment for your by pass)
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .
- Details
Double 36" Linestops on 36" PCCP Water Pipeline in Roswell, New Mexico
Job Date: November 21, 2018
JOB LOCATION: Roswell, NM.
PROJECT: Double 36" Linestop on PCCP Water Main
Item I Linestop 36" PCCP Water Main- No By Pass
2- 36" Linestop saddle for PCCP Water Main @70 PSI or Less (JCM 445 Shop Coat with Epoxy Waterway)
2- Installation of linestop saddle with air test
2- Installation of Temporary Valve
2 - Insertion of 36" linestop for 1 0 Days or Less
2- 2" Saddle with corp. stop and tap for blow down and equalizing pressure to remove linestop.
2- Removal of Linestop, install completion plug and Blind Flange
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .
- Details
Job Date: October 12, 2018
Location: San Antonio, Texas
Job Specifics: 30" Linestops on PCCP Water Main with 16" Bypass
Line Pressure: 100 PSI working pressure or less
Line Contents: Water Main
Pipe Material: PCCP L-301
Pipe Specifications: Pipe OD = 36.00” Max – Cylinder OD = 33.75”
ltem PCCP Lines top 30” PCCP Water Main – 16 By Pass
1 – Set Up and Mobilization to site
2 – 30” Linestop Fittings for PCCP Water Pipeline (100 PSI or less) (JCM 445 Primer Coated Bodies / Epoxy Coated Water Way – Alloy bolts)
2 – 24” Hot Taps to allow for linestop entry
2 - 2” Saddles with Taps for blow off and equalizing to remove linestops (JCM 425 Primer Coated Bodies / Epoxy Coated Water Way – Alloy bolts)
2 – Insertion of 30” linestop for 14 Days or Less
2– Removal of Linestop, install Completion Plugs and Blind Flanges. (24” ANSI 150# Flanged out off linestop equipment for your by pass)
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .