1-800-221-3332
Contact us Today!

 Anchorage, AK • Delaware, DE • Oklahoma City, OK • Nashville, TN • New Orleans, LA • Houston, TX

Double 36" Linestops on 36" PCCP Water Pipeline in Roswell, New Mexico

IFT Featured New Mexico Job: Double 36" Linestops on 36" PCCP Water Pipeline in Roswell - 5.0 out of 5 based on 7 reviews

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active

Double 36" Linestops on 36" PCCP Water Pipeline in Roswell, New Mexico

Double 36” Linestops on 36” PCCP Water Pipeline in Roswell, New Mexico

Job Status: Successful and Completed
Job Date: November 21, 2018
JOB LOCATION: Roswell, NM.
PROJECT: Double 36" Linestop on PCCP Water Main

Item I Linestop 36" PCCP Water Main- No By Pass
2- 36" Linestop saddle for PCCP Water Main @70 PSI or Less (JCM 445 Shop Coat with Epoxy Waterway)
2- Installation of linestop saddle with air test
2- Installation of Temporary Valve
2 - Insertion of 36" linestop for 1 0 Days or Less
2- 2" Saddle with corp. stop and tap for blow down and equalizing pressure to remove linestop.
2- Removal of Linestop, install completion plug and Blind Flange

OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .

 

 

Go to top