Dual 42" Linestops with 36" By Pass in Baltimore, MA.

Job Status: Successful and Completed
Job Date: March 13, 2018
JOB LOCATION: Baltimore, MD
PROJECT: Sewage Force Main

Line Pressure: 30 PSI working pressure or less Line
Contents: Sewage Force Main
Pipe Material: PCCP Pipe
Specifications:
1 - Pipe OD = 58.00” – Cylinder OD = 50.75”
1 - Pipe OD = 56.00” – Cylinder OD = 50.75”

ltem l Linestop 42” PCCP Sewage Force Main – with 36" By Pass
1 – Set Up and Mobilization to site
2 – 42” Linestop fittings for PCCP Sewage Pipeline (30 PSI or less) (JCM 445 Epoxy Coated Bodies / Epoxy Coated Water Way – Alloy bolts) Installation of saddles with test by our customer.
2 – Hot Taps to allow for linestop entry
2 – Insertion of 42” linestop for 7 Days or Less
2– Removal of Linestop, install Completion Plugs and Blind Flanges. 

OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .