36" Linestop & a 48" Linestop both with 20" By-pass Services

Job Status: Successful and Completed
Job Date: February 6, 2014
Location: Belchertown, MA
Job Specifics:
2 – Mobilization to site to Install and Remove Linestops

ltem l Linestop 36” RCCP Water Main – W / 20” By Pass
1 – 36” Linestop fittings for RCCP Water Pipeline (65 PSI or less) (JCM 455 Shop Coated Coated with Epoxy Coated Water Way)
1 – Installation of saddles with air test.
1 – Hot Taps to allow for linestop entry
1 – Insertion of 36” linestop
1 – 2” Saddle with Corp. stop and tap for blow down and equalizing pressure to remove linestop
1– Removal of Linestop, install completion plug and Blind Flange (20” ANSI 150# Flange on Bypass for your use)

ltem lI Linestop 48” RCCP Water Main – W / 20” By Pass
1 – 48” Linestop fittings for RCCP Water Pipeline (65 PSI or less) (JCM 455 Shop Coated Coated with Epoxy Coated Water Way)
1 – Installation of saddles with air test.
1 – Hot Taps to allow for linestop entry
1 – Insertion of 48” linestop
1 – 2” Saddle with Corp. stop and tap for blow down and equalizing pressure to remove linestop
1– Removal of Linestop, install completion plug and Blind Flange (20” ANSI 150# Flange on Bypass for your use)

OR call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .