1-800-221-3332
Contact us Today!

 Anchorage, AK • Delaware, DE • Oklahoma City, OK • Nashville, TN • New Orleans, LA • Houston, TX

California

IFT Featured California Job: Redlands Community Hospital 3/4", 2" and 3" Pipe Freeze Plugs on Domestic Copper HOT and COLD Water Line under 110 degrees F. - 5.0 out of 5 based on 2 reviews

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active

Redlands Community Hospital 3/4", 2" and 3" Pipe Freeze Plugs on Domestic Copper HOT and COLD Water Line under 110 degrees F.

Redlands Community Hospital many FreezePlug on Domestic Copper HOT and COLD Water Line under 110 degrees F.

Job Status: Successful and Completed
Job Date: September 11, 2017
JOB LOCATION:  Torrance, CA.
PROJECT: Torrance Medical Center
Job Specifics:
1 – Mobilization – Prep / Travel to job site
Item I – .75” - Freeze Plug on Domestic Copper HOT Water Line – under 110 degrees (F)
1 – .75” FreezePlug on .75” Copper waterline, under 110 degree (F) Under 150 psi.
FreezePlug held for up to 2 hours each freeze while you perform modifications to the pipeline

Item II – 2” - Freeze Plug on Domestic Copper HOT Water Line – under 110 degrees (F)
1 – 2” FreezePlug on 2” Copper waterline, under 110 degree (F) Under 150 psi.
FreezePlug held for up to 2 hours each freeze while you perform modifications to the pipeline

Item III – 3” - Freeze Plug on Domestic Copper Cold Water Line – under 110 degrees (F)
2 – 3” FreezePlugs on 3” Copper waterline, under 110 degree (F) Under 150 psi.
FreezePlug held for up to 2 hours each freeze while you perform modifications to the pipeline

OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .

 

 

IFT Featured California Job: 24" and 30" Linestop on RCP Water Main under 60 psi No By-pass - 5.0 out of 5 based on 4 reviews

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active

24" and 30" Linestop on RCP Water Main under 60 PSI No By-pass

24 and 30 inch Linestop on RCP Water Main under 60 psi No By-pass

Job Status: Successful and Completed
Job Date: September 25, 2017
JOB LOCATION:  Whittier, CA.
PROJECT: Torrance Medical Center
Job Specifics: Whittier Line stop Project
1 – Mobilization – Prep / Travel to job site
Item l - 30” Linestop® on 30” RCP Water Main - under 60 psi – No By-pass
2 - Mobilization – Prep / Travels to Site
1 - 30” x 24” Linestop® Fitting for RCP waterline (ANSI 150 Fitting)
(JCM 442 Fusion Epoxy Coated with Stainless Steel Bolts & Double Gasket)
1 - Install & Pressure Test Linestop® Fitting, Hottap Pipe, and install Linestop®
1 - 30” Linestop® held for up to 3 Days while you perform pipeline modifications
1 - Removal of Linestop and installation of Completion Plug with Blind Flange
1 - Blow-off assembly as required 
 
Item Il - 24” Linestop® on 24” RCP Water Main - under 60 psi – No By-pass
2 - Mobilization – Prep / Travels to Site
1 - 24” x 16” Linestop® Fitting for RCP waterline (ANSI 150 Fitting)
(JCM 442 Fusion Epoxy Coated with Stainless Steel Bolts & Double Gasket)
1 - Install & Pressure Test Linestop® Fitting, Hottap Pipe, and install Linestop®
1 - 24” Linestop® held for up to 3 Days while you perform pipeline modifications
1 - Removal of Linestop and installation

OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .

 

 

IFT Featured Oak Hill, California Job: 6" hot tap for County of San Bernardino - 5.0 out of 5 based on 2 reviews

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active

6" hot tap for County of San Bernardino in Oak Hill, California

6” hot tap for County of San Bernardino in Oak Hill, California

Job Status: Successful and Completed
Job Date: November 27, 2017
JOB LOCATION:  Seattle, WA.
PROJECT: 8" Pipe Freeze Plugs
Job Specifics:
Item I – 6” Hottap on Transite – A/C Waterline under 150 psi.
1 – 6” Hottap on Transite – A/C Waterline – below ground under 150 psi (Hottap ONLY on your pre-installed fittings and Valve)

OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .

 

 

IFT Featured California Job: Pacific Rim Mechanical 2.5" and 6" hottaps Hot and Cold Water Pipeline at Illumina Facility San Diego - 5.0 out of 5 based on 2 reviews

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active

2.5" and 6" Hottaps on Hot and Cold Water Pipeline at  Illumina Facility San Diego

Pacific Rim Mech 2.5 and 6 inch Hot and Cold Water Pipeline at Facility Illumina San Diego

Job Status: Successful and Completed
Job Date: September 22, 2017
JOB LOCATION:  San Diego, CA.
PROJECT: Illumina Facility
Job Specifics:
1 – Mobilization – Prep / Travel to job site

Item I – 2.5” Hot Tap on 3” Sch. 40 Carbon Steel Hot Water Line – under 150 psi
2 –2.5” Hot Tap on 3” Carbon Steel Hot Water line- under 150 psi /under 150 degrees
****Through Customer Supplied & Installed Fitting And Full Port Valve***

Item II – 6” Hot Tap on 12” Sch. 40 Carbon Steel Chilled Water Line
2 – 6” Hot Tap on 12” Carbon Steel Chilled Water line - under 150 psi
****Through Customer Supplied & Installed Fitting And Full Port Valve***

OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .

 

 

IFT Featured San Francisco, CA. Job: 28" Linestop with 20" hot tap for bypass - 5.0 out of 5 based on 3 reviews

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active

28" Linestop with 20" hot tap for bypass in San Francisco, California

28” Linestop with 20” hot tap for bypass in San Francisco, CA.

Job Status: Successful and Completed
Job Date: January 31, 2017
JOB LOCATION:  San Francisco, CA.
PROJECT: 28" Linestops and 20" hottaps
Job Specifics:

Item I: Linestop® on 28” OD HDPE Gravity Raw Sewer Main Pipeline 60 psi (approx) With 20” By-pass Outlet.
1 – Mobilization – Prep / Travel to site
2 – 28” Linestop Fittings for 28” OD HDPE Sewage Pipeline (100 psi or less) (JCM Epoxy Coated Fitting w/ Stainless Steel Bolts)
2 - Installation of Saddle with Air Test
2 - Hot Tap Pipeline for Linestop entry
2 – Insertion of 28” Linestop for up to 12 Hours while others perform pipeline work.
2 - By-pass Outlets (20”) off Linestop Machines, with
2 - 20” Knife Gate Loaner Valves
2 – Removal of Linestops, install Completion Plugs and Blind Flanges
2 - 2” Saddle w/ Corp. Stop and Tap for Blow Down and equalizing pressure to remove Linestop (if Required)

OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .

 

 

Subcategories

Go to top