1-800-221-3332

Houston, TX • Nashville, TN • Oklahoma City, OK • Wasilla, AK • Orlando, FL • Temecula, CA

UCSD Linestop 8" PVC - C-900 under 120 psi

IFT Featured California Job: UCSD Linestop 8" PVC - C-900 under 120 psi - 5.0 out of 5 based on 1 review

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active

UCSD Linestop 8" PVC - C-900 under 120 psi

UCSD Linestop 8inch PVC - C-900 under 120 psi

Job Status: Successful and Completed
Job Date: October 28, 2017
JOB LOCATION:  San Diego, Ca.
PROJECT: UCSD 8” Linestop Water Line
Job Specifics:
2 – Mobilizations / Travels to site
ltem l Linestop® - 8” PVC/C-900– under 120 psi
1- 8” Linestop fitting for PVC C-900 Water line Under 120 psi
1 – 8” Linestop fittings for PVC/C-900 Pipe (ANSI 150) (on One Linestop)
1 – Installation of assembly with air test. 1 – Hot tap to allow for Linestop entry
1 – Insertion of 8” Linestop for up to (9) Days, while others perform pipeline work.
1– Removal of Linestop, install completion plug and Blind Flange
1 – Blow-off assembly as required

OR call

Nationwide: 1-800-221-3332

International: 1-951-926-4849

Go to top