14" and 18" Indoor Linestop In Nashville, Tennessee

Job Status: Successful and Completed
Job Date: June 15, 2015
JOB LOCATION: Nashville, TN PROJECT: Carlex
Job Specifics: 1 – Travel to site to scrap and try to clean pipe to help perform a proper seal. 1 – Travel to site to perform indoor linestops 1 – Travel to site remove and complete indoor linestops ltem l Linestop Indoor 18” Carbon Steel - Mill Water Pipe – Horizontal 1 – Indoor 18” Linestop Using a 2LBin/IFT Split Weld Tee for Carbon Steel Mill Water Pipeline (60 PSI or less) (Provided by IFT and weld on by Contractor) 1 – Installation of temporary valve with air test. 1 – Hot Taps to allow for linestop entry 1 – Insertion of 18” linestop 1 – 2” Taps on contractor supplied and installed materials for blow down and equalizing pressure to remove linestop. 1 – 2 Day Hold while you make pipe modifications. 1 – Removal of Linestops, install completion plug and Blind Flange ltem 2 Linestop 14” Carbon Steel - Mill Water Pipe – Vertical 1 – 14” Linestop Using a 2LBin/IFT Split Weld Tee for Carbon Steel Mill Water Pipeline (60 PSI or less) (Provided by IFT and weld on by Contractor) 1 – Installation of temporary valve with air test. 1 – Hot Taps to allow for linestop entry 1 – Insertion of 18” linestop 1 – 2” Taps on contractor supplied and installed materials for blow down and equalizing pressure to remove linestop. 1 – 2 Day Hold while you make pipe modifications. 1 – Removal of Linestops, install completion plug and Blind Flange