1-800-221-3332
Contact us Today!

 Anchorage, AK • Delaware, DE • Oklahoma City, OK • Nashville, TN • New Orleans, LA • Houston, TX

Washington

IFT Featured Tukwila, Washington Job: 2.5” Pipe Freeze Plug on Sch. 40 Steel Water System pipeline Under 100 PSI. Under 100 degrees F. - 5.0 out of 5 based on 4 reviews

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active

2.5” Pipe Freeze Plug on Sch. 40 Steel Water System pipeline Under 100 PSI. Under 100 degrees F.

Job Status: Successful and Completed
Job Date: November 14, 2017
Location:  Tukwila, WA. 
Job Specifics:

ITEM I Pipe Freezing
1 - Mobilization – Prep / Travel
2– 2.5” Pipe Freeze Plugs on Water System Pipeline under 100 degrees (F) Glycol 25% or less Freeze Plugs held for up to 3 hours each freeze while you perform modifications to the pipeline

OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .

 

 

IFT Featured Seattle, Washington Job: 10" Linestop on DIP-CI-PVC Water Main below ground under 100 psi with Completion Plug - 5.0 out of 5 based on 4 reviews

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active

10" Linestop on DIP-CI-PVC Water Main below ground under 100 psi Washington with Completion Plug

10inch Linestop on DIP-CI-PVC Water Main below ground under 100 psi Washington with Completion Plug

Job Status: Successful and Completed
Job Date: November 3, 2017
JOB LOCATION:  Seattle, WA.
PROJECT: 10" Linestop
Job Specifics:
1 – Mobilization - Prep / Travel to site: 

Item I: 10” Linestop® on DIP/CI /PVC Water Main below ground under 100 psi
1 – 10” Linestop fitting - Epoxy Coated w/ SS nuts and Bolts
1 – Installation of Fittings and temporary valve with leak test.
1 – Hot Tap to allow for Linestop entry
1 – Insertion of 10” Linestop – held for up to 8 hours while Contractor performs Pipeline modifications
1 – Removal of Linestop, installation of Completion Plug and Blind Flange.
Installation of Blow-off assemblies as required for removal of Linestop

OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .

 

 

IFT Featured Seattle, Washington Job: 8” Pipe FreezePlug on Sch. 40 Steel Water System pipeline Under 100 psi - 5.0 out of 5 based on 3 reviews

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active

8” Pipe FreezePlug on Sch. 40 Steel Water System pipeline Under 100 psi

8” Pipe FreezePlug on Sch. 40 Steel Water System pipeline Under 100 psi

Job Status: Successful and Completed
Job Date: November 27, 2017
JOB LOCATION:  Seattle, WA.
PROJECT: 8" Pipe Freeze Plugs
Job Specifics:
Item I – 8” - FreezePlug on Sch. 40 Steel Water System pipeline – Under 100 psi – Under 100 degrees (F) Glycol Content not to Exceed 25% - if present
1 - Mobilization – Prep / Travel
4 –8”  Pipe Freeze Plugs on Water System Pipeline under 100 degrees (F) Glycol 25% or less FreezePlugs held for up to 5 hours each freeze while you perform modifications to the pipeline

OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .

 

 

Subcategories

Go to top